Google+
Showing posts with label Western Railway. Show all posts
Showing posts with label Western Railway. Show all posts

Tuesday, April 16, 2013

Western Railway Introduces 20 EMU services in Churchgate and Dahanu Road Section and extends 4 MEMU services


First EMU service in Dahanu Road-Churchgate will be flagged off by Shri Pawan Kumar Bansal, Hon'ble Minister of Railways in a function at Dahanu Road Railway station on 16th April, 2013. Shri Prithviraj Chavan, Hon'ble Chief Minister, Govt. of Maharashtra will be the Chief Guest. Other dignitaries will also be present on this occasion.
The EMU train which will be flagged off by Hon'ble Minister for Railways at 10.10 hrs from Dahanu Roadwill run stopping at all stations between Dahanu Road and Virar and then as a fast train between Virar and Churchgate. It will reach Churchgate at 12.58 hrs. Besides this, on 16/4/2013, one Virar-Dahanu Rd EMU train will be run ex Virar at 12.15 hrs reaching Dahanu Road at 13.45 hrs while another Dadar-Dahanu Rd EMU train will be run from Dadar at 18.00 hrs and it will reach Dahanu Road at 20.25 hrs. In up direction, Dahanu Rd-Dadar EMU train will be run e
x Dahanu Road at 15.25 hrs reaching Dadar at 17.50 hrs. Another Dahanu Rd-Virar EMU train will start from Dahanu Road at 20.45 hrs and will reach Virar at 22.00 hrs. The regular run of newly introduced EMU services will commence from 17/04/2013.
With only a couple of trains introduced in 1867 in Churchgate–Virar section, the suburban system has become the lifeline of the city, carrying more than 36 million commuters today. The history of EMU trains in Western Railway's suburban section in Mumbai dates back to 1928 when EMU trains were first introduced. To cater to the increasing volume of commuters, Western Railway was first to introduce 9-car EMU trains in 1962. Similarly, Western Railway was pioneer in introducing 12-car trains on its suburban section in 1986. Later, Western Railway earned the distinction of being 1st railway to introduce country's largest 15-car trains on its suburban section.

15 new EMU trains have been introduced in Churchgate-Dahanu Road Section.2 shuttle trains running between Dahanu Road and Borivali have been replaced by EMU and extended upto Churchgate.2 EMU services running between Dadar and Virar have been extended till Dahanu Road and 1 EMU services running between Churchgate and Virar has also been extended to Dahanu Road.

Apart from above, 4 MEMU services which were running between Dahanu Road and Virar have been extended upto Dadar.


Following new 20 EMU services has been introduced between Churchgate & Dahanu Road

Destination
DN
UP
Churchgate-Dahanu Road-Churchgate
3
4
Dahanu Road- Dadar-Dahanu Raod
1
1
Dahanu Road-Borivali- Dahanu Road
2
2
Dahanu Road- Virar- DahanuRoad
4
3

Tuesday, February 26, 2013

WR TO INTRODUCE FIRST AC COACH IN BANDRA TERMINUS-AHMEDABAD LOKSHAKTI EXPRESS

Lokshakti Express


For the convenience of the passengers Western Railway has decided to introduce o­ne First AC coach in train no. 19143/19144 Bandra Terminus – Ahmedabad – Bandra Terminus Lokshakti express w.e.f 15thMarch, 2013.

The booking for First AC class will start from 28thFebruary, 2013

Monday, February 25, 2013

Vadodara railway station goes hi-tech


VADODARA: Your next visit to the railway station at Vadodara is going to be a pleasant experience. The station is witnessing a major overhaul to extend latest facilities to passengers.


It is the first Western Railways station to introduce a biometric system for passenger reservation that generates a token based on thumb impression of a person wanting to book a ticket. The system will allow an individual to get registered again only after three hours.

"It will discourage touts from booking multiple train tickets or multiple tickets in one train," divisional railway manager ( DRM) Naveen Kumar Shukla told TOI while adding that the system is passenger friendly as they will not have to stand in queues. In future a camera will be installed inside the biometric machine to capture images of repeat comers.

The authorities have already installed 32 CCTV cameras, four touchscreens, apart from new scrolling electronic train charting display. "With the entire railway station connected on our Railnet facility, the station manager can take immediate administrative actions like opening a new window or checking if the booking clerk is missing from the counter," said Shukla. During a recent inspection, general manager of Western Railways Mahesh Kumar inaugurated Jan-Aahar facility, a modern food plaza on platform number. "While we have converted one retiring room into a model retiring room for passengers in transit giving it a typical hotel-room look with all the amenities including LED and modern fittings, the work to refurbish nine others will start soon," said Shukla.

Two lifts and ramps dedicated to senior citizens are also to be installed at the station in addition to two escalators that are being put up.